Click to return to Gigajob Nigeria's homepage. This is a CV of a candidate looking for a job as:

Electrical / instrument engineer (#130,901,902) 

Location: worldwide (CV #130,901,902)

profile picture cv
 

POSITION:STATION OPERATOR
DURATION:DEC. 2010– present
PROJECT:OPERATION AND MAINTENANCE OF NGC LAND PHASE 2 GAS COMPRESSOR STATION - AFIESERE GAS STATION
JOB DESCRIPTION:
Operating, Monitoring and recording of all running equipment, Gas flow and their operating parameters. Ensuring good housekeeping, Pollution control, Compressing and processing of gas, uninterrupting Power supply, availability of instrument starting Air system, dry Gas to the Generating set and also liaising with the flow station for availability of Suction Gas. Team leader of the gas station when on duty.
Aim: Effective compressing of Gas(from 2.5 bar to 32 bar ) . Proper Gas accountability and delivering of Gas from the station.

POSITION:ELECTRICAL/INSTRUMENT MAINTENANCE ENGINEER
DURATION:DEC. 2009 –DEC2010
PROJECT:NGC LAND PHASE 2 GAS COMPRESSOR STATION REFURBISHMENT AFIESERE GAS STATION
JOB DESCRIPTION:
Identify and replace all faulty electrical wiring & equipments,re-terminate Station Control panel (SCP)and Station Main control, refurbish / replace all field local panels and terminal blocks. Ensure connections between local panels and field facilities.
Ensure all electrical field facilities are in working condition
Service and power the existing Station generating set.
These jobs was perfectly carried out, some facilities were replaced while others refurbished.

POST HELD : Project Manager & Electrical /Instrument Engineer
DURATION: Jun 2006–July 2007
PROJECT :Rehabilitation and Maintenance of PTI’S ( stimulation flow station )
JOB DESCRIPTION:
Wellhead and flow line: - Service wellhead valves, other flow line valves. Provide and replace hand valves/gauges and provide six orifice plates.
Surge vessel :- service all valves. Provide and replace faulty ones.
Service two and provide one flow station Master control valve.
Extend power to the heater, test / rectify all leakages and malfunctions of the filaments.
Service and upgrade flow station control panel and also Service fisher scientific controller.


DURATION;APRIL 04-APRIL 2006
POST HELD:ELECTRICAL/INSTRUMENT INSTALLATION ENGINEER PROJECT;FACADOS - YOKRI INTEGRATED PROJECT (FYIP) ONSHORE SOUTH BANK FLOW STATION
JOB DESCRIPTION : CONSTRUCTION OF NEW FLOW STATION:
Installation of cable trays, running/supply of power to all skids and carried out the complete wiring/installation of split air Condition units, batteries in the battery room, fire detector panel, main station control panels, transformer units and emergency generating set.
Installation/tagging of all instruments and cables from the station instrument control room to all junction boxes and field skids.

Professional membership: Licensed electrical engineer( to operate/supervise any electrical job) of the Ministry of Power, Steel and Mine of the Federal Rep. Of Nigeria.

Personal Details

Name
Benard Akpoyibo
Gender
Male
Age
42 Years

Job Details

Employment Status
Full time
Type of Salary
Salary plus bonus
Preferred Job Location
worldwide

Educational Qualifications

Highest Qualification
Bachelor's degree  (Electrical and Electronics) from University of Portharcourt  with secondclass lower( 2 Marks / Grade / Class

Professional Details

Professional Experience
12 Years



E-Mail Alert

Get the latest Engineer CVs in Nigeria via email.
 
  • Statistics for this Jobseeker's Posting

    Gigajob-ID
    130,901,902
    Posted
    > 99 days ago
    Short-Link
    https://ng.gigajob.com/130901902.html
    Seen in Search Results
    This ad was matched 366 time(s) in Gigajob search results
    Page Viewed
    This ad was viewed 134 time(s) by Gigajob users